Stock cabinets move faster than semi-custom or custom cabinetry, which carries its own lead time. Because of that, the cabinet type you choose sets when your kitchen can start, often more than demolition day does. Urban Remodeling builds the cabinet order into a written timeline, so you know the calendar before work begins.
What changes between stock, semi-custom and custom cabinets?
The main differences are how much choice you get and how long the order takes. Stock cabinets come in set sizes and styles. Semi-custom cabinets let you adjust sizes and finishes. Custom cabinets are built to your exact room.
More choice usually means more time between order and delivery. The speed difference is the part that affects your schedule. Stock moves faster, while custom cabinetry carries its own lead time, and semi-custom sits in between.
Here is how the three compare on the points that matter for planning.
- Stock: set sizes and styles, the quickest to get, fewer choices.
- Semi-custom: more sizes and finish options, a longer wait than stock.
- Custom: built to fit your room, the most freedom, and its own lead time.
No one can promise an exact number of weeks without checking the order, so ask the supplier for a date in writing before you plan around it.
Why does cabinet type set the start date?
The cabinets have to be on site before installation can happen, and everything else is scheduled around that arrival. Demolition can start quickly, but a kitchen with no cabinets coming is a kitchen you cannot use.
That is why the order date matters more than the demo date. If the cabinets take a long time to arrive, starting demolition early only leaves you without a kitchen for longer.
Many homeowners in Vero Beach and Sebastian plan the work backward from delivery. Pick the cabinets, confirm the delivery date, and then set the demolition date to match. Our kitchen remodeling page explains how a project is organized.
When should you order cabinets?
Order as soon as the design and measurements are final, and before demolition if you can. The sooner the order goes in, the sooner the clock starts on the lead time.
Here is a simple order of steps that keeps the schedule honest.
- Decide on the layout and the cabinet type.
- Take final measurements of the room.
- Approve the cabinet design and finish.
- Place the order and ask for a written delivery estimate.
- Set the start date for demolition to follow the delivery estimate.
Changing the layout after the order is placed can reset the clock. Settle the plan first, then order.
If your cabinets are in good shape, there may be another route. Our post on cabinet refacing vs. replacement explains when keeping the boxes makes sense, which can also shorten the calendar.
What goes into the written timeline?
A written timeline lists the steps in order and ties each one to a date or a trigger. It should include the cabinet order, the delivery, demolition, installation and finishing work.
Urban Remodeling puts one written scope and price in front of you before work starts. The cabinet type and its lead time are part of that conversation, so there are no surprises about when the kitchen will be ready.
Ask to see these items in your timeline.
- The cabinet type and the date the order will be placed
- The estimated delivery date from the supplier
- When demolition will start and who will handle it
- Permits and inspections, which are handled for you
- What happens if the delivery date moves
Permits are pulled under the contractor's own license and inspections are handled for you, so those steps are on the same calendar as the rest of the work.
Which cabinet type fits your schedule?
Choose stock if your priority is getting started and finishing sooner. Choose semi-custom if you want more control over sizes and finishes and can wait a little longer. Choose custom if the room has unusual dimensions or you want a specific look, and you can plan for the lead time.
Think about your own situation. A family that needs a working kitchen before a holiday has less room to wait. A homeowner planning a remodel for next season can order custom cabinets and give the order time.
It also helps to think about budget and style, but those are separate decisions from the schedule. Do not pick a cabinet type for speed alone if it will not work in your room, and do not pick custom without checking that the wait fits your plans.
Can you use your kitchen during a remodel?
Usually only in a limited way. Once demolition starts, the sink, stove and counters are out of service until the new ones go in. A short setup elsewhere in the house can help, such as a small table with a microwave and a coffee maker.
This is another reason to settle the cabinet order first. The less time between demolition and installation, the shorter the stretch without a working kitchen.
What if the delivery date changes?
Tell your contractor right away, and ask them to update the written timeline. A moved delivery date should move the rest of the schedule, so the crew is not waiting on site.
Keep your own copy of the supplier's estimate. Having it on paper makes it easier to see what changed and what to adjust.
Urban Remodeling serves Vero Beach, Sebastian, Fort Pierce, Port St. Lucie, Stuart and Melbourne. To talk through cabinet options and a start date, call (772) 404-8397 for a free estimate.
Thinking about this project?
Call for a free kitchen estimate. We’ll walk the space with you and put a written price in front of you.
Call (772) 404-8397 Request a Free Estimate