Walls and curbs are rarely perfectly square, so the glass is measured on the finished tiled opening and ordered to that exact size. Measuring earlier would be a guess. Waiting until the tile is done gives the glass maker the true size of the space, which is why a short gap before installation is normal.
At Urban Remodeling, every opening is measured after the tile is finished, because walls and curbs are rarely perfectly square. This post walks through the order of work behind our sliding glass shower doors, from the last tile to install day.
Why not order the glass early?
Ordering early means the glass is cut for an opening that does not exist yet. Until the tile, grout and trim are done, the final size is still moving, even by a small amount. Glass cannot be trimmed on site, so a small miss becomes a gap or a piece that does not fit.
Tile thickness, the thickness of the setting bed and the way the curb is finished all change the opening. Two weeks before the tile is done, nobody can say exactly how wide the space will be. So the order waits for the finished surface.
What gets measured on the finished opening?
The measurement covers the width, the height and the shape of the opening, taken at several points and not just one. A tape measure at the top, middle and bottom will often show three different numbers.
Here is the usual order of the visit:
- Check that the tile, grout and curb are complete.
- Measure the width across the top, middle and bottom of the opening.
- Measure the height on each side and at the center.
- Check the walls and the curb with a level for plumb and level.
- Note the door style, the hardware position and where the door will open.
- Confirm the numbers and record them for the order.
Those notes go on the order, so the glass is made for the opening you actually have.
Why do square walls and curbs matter?
A glass door is a rigid, flat panel, so it cannot bend to follow a wall that leans. If a wall is out of plumb by a small amount, the gap at the top can be different from the gap at the bottom. A straight panel in a crooked opening leaves uneven spaces.
Tile work, framing and the curb all add small differences. Most bathrooms have them. That is why the measurement is taken at several points, and why the glass is made to the measurements and not to a standard size. For help choosing the glass itself, read our guide on shower glass choices for humid bathrooms.
This is also why your tile setter and the glass crew work in a set order. The tile comes first, then the measurement, then the glass. Each step depends on the one before it, and skipping ahead only causes rework.
Why is there a wait before installation?
The wait is the time it takes to make glass to your exact size after the measurement. Because each piece is cut for one opening, it is not something to pick up off a shelf.
During the wait, the bathroom is usually finished except for the door. You can use the space while the glass is made, although some people hold off on showers until the door is in. Ask us how long the glass should take for your job, since we do not want to promise a time that the glass maker has not confirmed.
What happens on install day?
On install day, the glass arrives, the hardware goes on and the crew fits the door to the opening. If the measurement was taken carefully, the door should sit as planned.
Here is what you can expect at your home:
- The crew checks the glass and hardware against the order.
- They set the track, hinges or rollers where the notes call for them.
- The glass goes in and is adjusted for a smooth, even fit.
- Seals and fasteners are checked, then the crew cleans the glass.
- You are shown how the door opens and how to care for it.
Take a few minutes to try the door yourself before the crew leaves, so you can ask questions while they are there.
What does the written price include?
You get one written scope and price before work starts, so you know what the project covers. Ask that the glass door is listed in it, with the style, the hardware and the opening it is made for.
A clear written scope helps you avoid surprises. If anything about the opening changes after the quote, ask how the change affects the door before the tile work is complete. We are glad to go over it in person.
Where does Urban Remodeling work?
Our office is at 1125 US Hwy 1, Vero Beach, FL. We serve Vero Beach, Sebastian, Fort Pierce, Port St. Lucie, Stuart and Melbourne. We handle kitchen, bathroom and whole-home remodeling, flooring, and outdoor kitchen and patio work, so the tile and the glass can come from the same team. See our bathroom remodeling page for more.
Planning a new shower? Call Urban Remodeling at (772) 404-8397 for a free estimate, and we will explain how the glass fits into the plan.
Thinking about this project?
Call for a free bathroom estimate. We’ll walk the space with you and put a written price in front of you.
Call (772) 404-8397 Request a Free Estimate