You can start a kitchen remodel before the holidays if you accept that you will be without a kitchen for at least part of the project. Ask for the written timeline first and plan a temporary setup before demolition starts. Our kitchen remodeling begins with that conversation.
If you host family in November and December in Vero Beach, Sebastian or nearby, a little planning keeps the season calm. This guide covers what to settle, what to set up, and what to do if the schedule and a holiday collide.
Should you start a kitchen remodel before the holidays?
Start only if you are comfortable cooking without a kitchen for a stretch of time and you have the timeline in writing. If you are hosting a big meal, it may be better to wait until the season is over.
Think about what your holidays look like. If you cook for a crowd, a kitchen under construction is a big change. If you mostly travel or eat out, it may not matter much. Be honest with yourself about how you use the room from November to January.
Planning, design and material choices can happen now even if demolition waits until after the holidays. That way, you are ready to go once the season ends. Our post on how to prepare for a kitchen remodel in Vero Beach covers the early steps.
How long will you be without a kitchen?
You will be without a kitchen for at least part of the project, and the length depends on the size of the remodel. We do not guess at a number before we see your space. The written scope and timeline give you the real answer.
Different jobs take different paths. A remodel that changes the layout, moves plumbing or replaces everything is a bigger job than one that swaps cabinets and counters. Ordering materials also takes time, and a late order can slow the work.
This is why the plan comes first. Ask your contractor to walk you through each stage and tell you when the kitchen is out of use. Urban Remodeling gives you one written scope and price before work starts, so nothing is left to guess.
What does a temporary kitchen setup need?
A temporary kitchen needs a place for food, a way to heat it and a way to wash up. Set it up in another room before work begins so your family can keep eating without stress.
A simple temporary setup often includes:
- A table or counter in a dining room, garage or spare room.
- A microwave and a small countertop appliance such as a toaster oven or slow cooker.
- A cooler or small fridge for items you use every day.
- Paper plates, cups and utensils, plus a bin for wash-up.
- A bathroom sink or tub for washing larger items, if the kitchen sink is out.
Move your daily items before demolition starts. Pack dishes, pantry food and small appliances you will not use. Clear the counters and empty the cabinets so the crew can work without moving your things.
Plan your meals ahead too. Simple meals, prepared food and takeout carry most families through. Keep a short list of what you can make with only a microwave.
Who walks you through what to expect and when?
The Urban Remodeling team walks you through what to expect and when, so you can plan a temporary setup before demolition starts. This happens at the start, before any work begins.
Here is what the walkthrough covers:
- The scope of the remodel and what gets removed.
- The order of work and which days the kitchen is out of use.
- Permits. Permits are pulled under the contractor's own license, and inspections are handled for you.
- Which materials are chosen and which are still open.
- What you need to move out of the kitchen and by when.
Ask questions at this stage. If you have a holiday gathering coming up, mention it. We cannot promise a finish date, but we can show you how the stages line up with your calendar, and then you can decide.
What if the schedule and the holiday collide?
If the schedule runs into a holiday, talk to your contractor right away and plan a pause or a backup. Do not wait until the week before. An open conversation early gives you more choices.
Here are a few ways families handle it:
- Ask whether work can pause for a key holiday so the kitchen is easier to use.
- Host at a relative's home or a restaurant for that one day.
- Keep the temporary kitchen running a bit longer than you think you need.
- Choose a start date after the holidays for the main demolition.
Delays can happen. A late material, a surprise behind a wall or bad weather can move the plan. A written timeline with clear steps helps you see what moved and why.
If you are also thinking about other rooms, take a look at our whole-home remodeling for bigger plans. We serve Vero Beach, Sebastian, Fort Pierce, Port St. Lucie, Stuart and Melbourne, and our office is at 1125 US Hwy 1, Vero Beach, FL.
Call Urban Remodeling at (772) 404-8397 to book a free estimate. Tell us when you host and when you want to start, and we will build the plan around your holidays.
Thinking about this project?
Book a free kitchen estimate. We’ll walk the space with you and put a written price in front of you.
Call (772) 404-8397 Request a Free Estimate